A high-efficiency on-grid solar project developed for a can manufacturing factory with a hangar-style layout, designed to maximize solar power generation in an industrial environment.
The system includes 546 JA Solar PV panels rated at 550W each, with a total installed capacity of 300 kW in Phase 1, delivering reliable energy performance for industrial operations.
The project is currently being expanded to a significantly higher capacity in Phase 2, reflecting the system’s scalability and long-term energy strategy.
The installation operates through 8 Huawei inverters rated at 40 kW each, ensuring stable performance and high conversion efficiency. The system is supported by a durable aluminum mounting structure, providing long-term strength and resistance to environmental conditions.
The estimated annual energy production reaches approximately 504,000 kWh/year, helping reduce operating electricity costs and improve energy efficiency.
Annual energy production of up to 504,000 kWh
300 kW system with scalable expansion in Phase 2
Powered by 8 Huawei inverters for high efficiency and stability